Eliminating fugitive emissions and the need to construct gas-lift control facilities in the field – Liftrock
(866) 660-0149
Emissions mitigated from atmosphere to date: Methane 435,212.26 (V) MMSCFD, Volatile Organic Compounds (VOC's) 6,070.27 Tons, Hazardous Air Pollutants (HAP's) 85.78 Tons, Captured Gas Value $2,074,390.95

Eliminating fugitive emissions and the need to construct gas-lift control facilities in the field

QuickSet™ is a skid-mounted gas lift control system that eliminates fugitive methane emissions. This patented system is delivered to the well site fully preassembled and pre-tested, and ready for final piping connections. It offers a complete gas-lift facility solution that is ready for operation within a matter of days, rather than the weeks or months required for traditional stick-built field construction.

The patented QuickSet skid-mounted gas lift control system was designed from the start to save operators time and money, while also delivering superior gas-lift performance.

The QuickSet unit is delivered using over-the-road transport, then craned into position, ready for final piping connections. As a result, the amount of on-site labor needed to complete a gas-lift facility is reduced to a fraction.

And, because QuickSet is pre-assembled and quality-tested at a certified facility, it eliminates the risk of delays, labor shortages or cost overruns at the well.

“The elimination of field construction is just one of the ways QuickSet provides operators with a more efficient gas-lift solution, with improved uptime and higher ROI,” according to BJ Ellis, Liftrock president. The QuickSet system also eliminates methane emissions during gas lift along with liquid storage and transport at the well.

Find out more at www.liftrock-co.com.

Contact:
BJ Ellis
Liftrock
Email: bj.ellis@liftrock-co.com
Phone: 817.408.6967

-30-